Vaughan Constructions has completed another multi-level industrial facility, Platform, for Hale in Milperra, NSW.
This venture sees the completion of a circa 38,000m² multi-level warehouse that includes tenancies ranging from 2,900m² to 10,102m².
The facility features two floors of warehousing, four levels of office space, an external ramp to provide access to level one and 30-metre-wide breezeways on both levels for undercover loading areas.
The project includes a range of sustainability initiatives such as a PV solar system and rainwater harvesting and is targeting a 4 Star Green Star rating.
To gain access to our web based Subcontractor Ordering System (SOS) tendering system, please use the login link below. If you don't have a login, you may download our Subcontractor Prequalification Form.